The objective of the study is to:
• To confirm the location and define the most suitable type of hydraulic works for reversing the dynamic flows and bring them closer to the quays of the port of Brazzaville
• To draw up the proportional investment scheme and budgets required for realising the works
• To prepare the Tender Dossiers for the Hydraulic Works, Quality Control and Works Supervision Services under the EC’s 10th EDF procedures
• To prepare the Project Identification Fiche for presenting the project and investment scheme to the EC for subsequent examination, approval and eventual financing.
(EUROPEAID/ 119860/C/SV/multi).